5.3 图名
管道布置平面piping arrangement plan (PAP)
管道布置piping layout
轴测图isometric drawing
分区索引图key plan
初版设备布置图(“A”版) preliminary plot plan (“A” issue)
内部审查版设备布置图(“B”版) inrernal approval plotplan ( “B” issue)
用户审查版设备布置图(“C”版) owner approval plot plan( “C” issue)
确认版设备布置图(“D”版) confirm plot plan ( “D”issue)
研究版设备布置图(“e”版) planning plot plan ( “E”issue)
设计版设备布置图(“F”) designing plot plan ( “F”issue)
施工版设备布置图(“G”版) construction plot plan (“G” issue)
5.4 厂房、站、单元
压缩机房compressor house (room)
泵房 pump house (room)
洗眼站eye washer station
泡沫站foam station
软管站,公用工程站hose station (HS), utility station
成套设备package unit
设施 facilities
罐区 tank yard
空分装置air separation facility
5.5 设备布置
设备位号equipment item number
工厂 plant
工厂区界plant limit
项目区界内侧inside battery limit (I.S.B.L.)
项目区界batterylimit (BL)
区界 area limit
区域边界zone iimit
界外 off site
东 east (E)
西 west (W)
南 south (S)
北 north (N)
上 up
下 down
工厂北向plant north
真实北向true north
道路 road
小过道cat walk, cat way
走道,过道walk way, gangway, access way
污水坑(井)sump pit
集水池catch basin
沟槽 through
预留区trough
场地 future area
铺砌区paving area
非铺砌区unpaved area
碎石铺面gravel paving
橡皮铺面 rubberpaving
面积,区域area
体积,容积volume (VOL)
5.6 管道布置
管道设计piping design
管道研究piping study
走向研究routing study
重要管道critical piping
地上管道above ground piping
地下管道under ground piping
管网 network of pipes
管廊 pipe rack
管沟 piping trench
管间距line spacing
管道跨距line span
总管 header, manifold
旁路 by pass
排液 drain
放空 vent
上升管,垂直管riser
导管 canduit
裸管 bare iine
管件直接fitting to fitting (FTF)
管段,接口spool piece, spool
取样接口sampling connection
集液包drip leg
伴热管tracing pipe
蒸汽伴热steam tracing
热水伴热 hot-watertracing
电伴热electrical tracing
夹套管jacketed line, jacketed piping
全夹套的full jacketed
平面 plan
详图 detail
“ ”视图X view “X”
“ ”剖视A-A section “A-A”
连接图hook up drawing
接续图continue on drawing (COD)
接续线match line (M.L.)
比例 scale
图例 legend
符号 symbol
管口表list of nozzles
方位 orientation
管口方位nozzle orientation
定位 location
相交 intersection
水平的horizontal
垂直的,立式的vertical
垂直,正交,垂直的perpendicular
平行,平行的parallel
水平安装horizontal installation
垂直安装vertical installafion
对称的symmetric
相反(的),对面(的)opposite
顺时针方向clock wise
逆时针方向counter clock wise
计算机辅助设计computer aided design (CAD)
5.7 图面标注
绝对标高abselute elevation
海平面标高over-sea mean level (OSL)
标高,立面elevation (EL)
混凝土顶面top of concrete
架顶面top of support (TOS)
钢结构顶面top of steel
梁项面top of beam (TOB)
支撑点point of suppon (POS)
管顶 top of pipe (TOP)
管底 bouom of pipe (BOP)
沟底 boaom of trench
管子内底invert (inside bottom of pipe)
底平 flat on bottom (FOB)
顶平 flat on top (FOT)
工作点working point (W.P.)
面至面face to face (F-F)
中心至端面center to end (C-E)
中心至面center to face (C-F)
中心至中心,中至中center to center (C-C)
坐标 coordinate
坐标原点origin of coordinate
出口中心线center line of discharge
入口中心线center line of suction
中心线centerline (CL)
入口 inlet, suction
出口 outlet, discharge
排出口 exhaust
距离 distance
|
|