油气储运网

 找回密码
 立即注册

QQ登录

QQ快速登录

一步迅速开始

pdms培训&项目数字化360网

principle of Pig launchers and receivers 发球筒收球筒原理

2018-7-12 08:22| 发布者: helloshigy| 查看: 14693| 评论: 0

摘要: Pig launchers and receivers are commonly used in upstream oil and gas industry for periodic cleaning of pipelines carrying crude oil, natural gas and water from oil wells.


Pig launchers and receivers are commonly used in upstream oil and gas industry for periodic cleaning of pipelines carrying crude oilnatural gas and water from oil wells. A pig is a bullet shaped object which fits the pipeline from inside. The pig launcher launches the pig into pipeline and the upstream pressure pushes the pig to other end of the pipeline where it is received by the pig launcher. Hence generally arrangement for pig launchers and receivers are essentially the sameexcept for the difference between 'Kicker line' position for launchers and receivers. The sample drawing presents this general arrangement common to pig launchers and receivers.

 1.Proper equipment symbol for pig launcher (vertical or horizontal) should be selected first of allas shown in the presented drawing. This should be selected from the list of equipment symbols on the legend sheets of a particular project.

 2.The major and minor barrels of the pig trap should be indicated as shown in the sample drawing. Minor barrel size is equal to pipeline size and the major barrel size is slightly larger.

 3.All the nozzles on the pig launcher should then be correctly represented with size and flanges. This includes door on the launcherpig outlet to pipelinekicker linebalancing linePSV connectionpurgeventdrain and instrument nozzlesas shown in the sample drawing presented here. Typicalinstrumentation on the pig launcher would be pressure gauges and transmitters and pig indicators to know if the pig has been launched (or arrived in the case of pig receivers).

 4.Different lines connected to the pig launcher are the next to be drawn up. Line numbermaterial classsize etc. is to be correctly assigned to each of the lines.

 5.Kicker line is used to pressurize the upstream side of pig so it can be launched. In case of receiverkicker line provides an outlet for fluids arriving in the pig trap. Normally when pigging is not being performedkicker line is closed using normally closed valve.

 6.Balancing line connecting the kicker line to minor barrel of the pig launcherhelps lower the pressure differential so that sudden shooting of the pig will not damage downstream automatic valves.

 7.A bypass line of the pig launcher is the normal route for the fluids when pigging is not taking place. This section upstream to the shutdown valve at beginning of pipeline can be protected against overpressure as indicated in the sample drawing.

 8.The hand operated valve (HV) on the bypass line is used to create a pressure differential for launching the pig (also for receiving the pig). A pressure differential indicator (PDI) has to be available to the HV operator to monitor the pressure differential.

 9.On the outlet of the pig launcheranother hand operated automatic valve is provided to open up the launcher upon pressurization.

 10.The pig launcher (and receiver) are also protected against overpressure with a PSV which discharges to flare. Typical representation of PSVs can be referred to in another article.

 11.Isolation valvesspectacle blindsspacers etc. to be used for maintenance should be drawn up nexton various lines to and from the pig trap. The spectacle blindsspacers etc. are usually connected right next to the isolation valves and equipment nozzlesas indicated in the sample drawing presented here.

 12.Drains should be provided either on major or minor barrel or on both for complete draining of the pig trap after the pig is launched or received. Sample drawing has indicated drains on both the barrels. These drains are connected to the closed drain system.

 13.Vents to flare and to atmosphere are required on pig launchers. Venting to flare for depressurization of the pig launcher can be achieved using bypass on the relief valve. For maintenancewhen pig is not in operation it can be vented to atmosphere.

 14.A utility connection is required to purge the pig launcher / receiver after the pigging is done and the pig trap is depressurized and drained. A nitrogen connection should normally be provided as indicated in the sample drawing.

 15.Most of the guidelines mentioned for pig launchers also hold good for pig receivers.

 16.All the guidelines given here are very general and may be modified as per specific requirements of any particular project.

5

鲜花

握手

雷人
1

路过

鸡蛋

刚表态过的朋友 (6 人)

最新评论

扫码访问手机版

QQ|关于我们|网站地图|油气储运网 ( 鲁ICP备11007657号-3 )

GMT+8, 2024-12-28 01:04 , Processed in 0.016776 second(s), 9 queries , Gzip On, MemCached On.

Powered by Discuz! X3.5

Copyright © 2001-2023, Tencent Cloud.